Skip to Content

Odoo Manufacturing Module


All the functionality you require to meet the needs of a manufacturing company


Apply for a free consultation

Monitor equipment maintenance

Manage the product life cycle

Control the quality of production

Plan manufacturing using the master production schedule


Automatically create a manufacturing order based on a demand forecast,

available stock, or indirect demand.

Manufacturing management


Manufacturing Order

Manage products on production lines or in manual assembly.

Work Order

Start the task when the product reaches the production level.

Use of barcodes

Speed up a production task by barcodes, scanning batch, serial numbers, or an action completion barcode, such as starting, pausing, or moving to the following action on the stopwatch.  

Manufacturing scheduling and planning


Manufacturing planning

Odoo provides complete information on available resources to plan all manufacturing thoroughly.

Work center capacity planning

Odoo offers the use of a production schedule to plan each work center.

Manage Bill of Materials

Manage available products, automatically purchase the products you need, and track production times.

Flexible data availability


Create multi-level Bills of Materials

Odoo can track complex production and understand which set of materials it relates to.  

Version change management

Create new work order routes that will facilitate production in the proper sequence.

Kits

This Odoo functionality allows salespeople to sell prefabricated component kits.

​Reach production with warning notices on worksheets or workshop dashboards

​Attach documents directly to a kit, routes, and more

Odoo is a powerful system that allows you to manage multiple versions of documents

Product lifecycle management


Product version control

Odoo allows you to track different versions of a product and control changes.

Engineering changes

Manage all changes using the Kanban view.

Document management

Keeping documents, worksheets, and plans in bills of materials and itineraries.

Quality control


Control points

Create quality control plans to initiate quality checks on specific inventory operations (receiving and a final inspection) or manufacturing processes (in-process inspection).

Quality check

Build your statistical process control through checks.

Quality alerts

Organize your work using the Kanban view of quality alerts.

Maintenance


Preventive maintenance

Create automatic maintenance based on performance indicators.

Corrective maintenance

Odoo allows you to request maintenance directly from the control center dashboard.

Scheduled maintenance

Schedule maintenance in your calendar and follow it up.

Maintenance analysis

Odoo provides complete statistics on maintenance performed.

Workcenter Control Panel


Tablets

Increase workshop efficiency by providing employees with tablets.

Worksheets

Show the worksheets directly in the workshops with instructions to the operator.

Work order steps

Define the chronology of the task and link it to the worksheet - scan product, weld, quality control, etc.

Various operations

Carry out inspections in workshops and record product defects.   

Tell us about your goals